ردیف | عنوان مقاله | عنوان مجله | شماره مجله | کشور محل چاپ | همکاران |
1
| A Hybrid MCDM Model with Interval Weights and Data for convention site selection | Journal of Applied Sciences | 8 | - | M. Amiri, M. Zandieh, B. Vahdani, R. Soltani |
2
| A simulated annealing algorithm for flexible job- shop scheduling problem | Journal of Applied Sciences | 9 | - | M. Gholami, M. Zandieh, M. Mousakhani |
3
| An Artificial Immune Algorithm for the flexible job-shop scheduling problem | Future Generation Computer Systems | 26 | - | A. Bagheri, M. Zandieh, I. Mahdavi |
4
| A variable neighbourhood search algorithm for the flexible job-shop scheduling problem | International Journal on Production Research | 48 | - | M. Amiri, M. Zandieh, A. Bagheri |
5
| flexible job-shop scheduling with parallel variable neighborhood search algorithm | Expert Systems with Applications | 37 | - | M. Amiri, M. Zandieh |
6
| Nadir compromise programming: A model for optimization of multi-objective portfolio problem | Expert Systems with Applications | 38 | - | M. Amiri, M. Ekhtiari |
7
| کاربرد روش شناسي سطح پاسخ براي تعيين عوامل موثر بر فرايند آبکاري الکتريکي | فصلنامه مطالعات مديريت صنعتي | 20 | - | مهشيد ايوبي، امين غروري |
8
| Hybrid Meta-heuristic Algorithm for Task Assignment Problem | Journal of Optimization in Industrial Engineering | 7 | - | M. J. Tarokh, M. Sharifi, M. N. Mokhtarian |
9
| زمانبندي يکپارچه توليد و حمل هوايي در زنجيره تامين با در نظر گرفتن زمان¬هاي آماده¬سازي وابسته به توالي | نشريه بين المللي مهندسي صنايع و مديريت توليد | 25 | - | رضا توکلي مقدم، صابر ملاعليزاده زواردهي |
10
| Developing two multi-objective evolutionary algorithms for the multi-objective flexible job shop scheduling problem | The International Journal of Advanced Manufacturing Technology | 64 | - | S. H. A. Rahmati, M. Zandieh |
11
| A simulated annealing/local search to minimize the makespan and total tardiness on a hybrid flowshop | The International Journal of Advanced Manufacturing Technology | 64 | - | S. M. Mousavi, M. Zandieh |
12
| A vibration damping optimization algorithm for a parallel machines scheduling problem with sequence independent family setup times | Applied Mathematical Modelling | 39 | - | E. Mehdizadeh, R. Tavakkoli Moghaddam |
13
| Multi-factory parallel machine problems: Improved mathematical models and artificial bee colony algorithm | Computers and Industrial Engineering | 81 | - | S. Gohari, B. Naderi |
14
| A model and metaheuristic for truck scheduling in multi-door cross-dock problems | Intelligent Computation and Soft Computing | 21 | - | B. Naderi, M. Mousakhani |
15
| Truck routing and scheduling for cross-docking in the supply chain: model and solution method | RAIRO Operations Research | 51 | - | B. Naderi, S. Rahmani, S. Rahmani |
16
| مديريت ريسك اعتباري تحت عدم قطعيت با استفاده از يك روش ويكور فازي | نشريه بين المللي مهندسي صنايع و مديريت توليد | 1 | - | محمد جعفر تارخ، مير بهادر قلي آريا نژاد ، مصطفي اختياري |
17
| An electromagnetism- like meta- heuristic for open shop problems with no buffer | Journal of Industrial Engineering International | 8 | - | B. Naderi, E. Najafi |
18
| انتخاب مدير پروژه با بکارگيري يک رويکرد ترکيبي دلفي- ويکور فازي | پژوهش هاي مديريت در ايران | 4 | - | رضا توکلي مقدم، اسماعيل نجفي |
19
| الگوريتم مرکب از تحليل پوششي داده ها (DEA) و فرآيند تحليل شبکه اي (ANP) در ارزيابي عملکرد در دانشکده ها | فصلنامه مديريت کسب و کار | 8 | - | اسماعيل نجفي، الهه شريعتمداري سرکاني، مصطفي مردي |
20
| A mathematical model and a solution method for hybrid flow shop scheduling | Journal of Optimization in Industrial Engineering | 10 | - | E. Najafi, B. Naderi, H. Sadeghi |
21
| Modelong and scheduling lot streaming flexible flow lines | Journal of Optimization in Industrial Engineering | 18 | - | B. Naderi |
22
| يک الگوريتم فراابتکاري ترکيبي براي مسئله زمان بندي کار کارگاهي منعطف با منابع دوگانه محدود انسان و ماشين | فصلنامه علمي – پژوهشي مطالعات مديريت صنعتي | 33 | - | مصطفي زنديه، رضا توکلي مقدم |
23
| Modeling and Scheduling No-idle Hybrid Flow Shop Problems | Journal of Optimization in Industrial Engineering | 21 | - | B. Naderi |
24
| Single model approach to evaluate optimistic and pessimistic congestion in fuzzy data envelopment analysis | Journal of Mathematics and Computer Science | 9 | - | A. Alinezhad, F. Baghbani-Abootaleb |
25
| Availability analysis for a specific assembly system with intermediate buffers:a case study | Research Journal of Recent Sciences | 5 | - | B. Naderi, M. Dabiri, A. Arshadi-Khamseh |
26
| Polynominal time approximation algorithms for proportionate open-shop scheduling | International Transactions in Operational Research | 21 | - | B. Naderi, M. Zandieh |
27
| solving a fuzzy fixed charge solid transportation problem by metaheuristics | Mathematical and Computer Modeling | 57 | - | S. Molla-Alizadeh-Zavardehi, S. Sadi-Nezhad, R. Tavakkoli-Moghaddam |
28
| Evaluating project managers by an interval decision- making method based on a new project manager competency model | Arabian Journal for Science and Engineering | 39 | - | H. Sadeghi, M. Mousakhani, M. Delavari |
29
| Hybrid flexible flowshop problem: models and solution methods | Applied Mathematical Modelling | 38 | - | B. Naderi, Sh. Gohari |
30
| A model and imperialist competitve algorithm for hybrid flow shops with sublots and setup times | Journal of Manufacturing Systems | 33 | - | B. Naderi |
31
| A real multi-objective bin packing problem: a case study of an engine assembly line | Arabian Journal for Science and Engineering | 39 | - | B. Naderi |
32
| Two meta-heuristic algorithms for the dual-resource constrained flexible job-shop scheduling problem | Scientia Iranica | 3 | - | M. Zandieh, R. Tavakkoli-Moghaddam, F. Jolai |
33
| Evolutionary algorithms for multi-objective dual-resource constrained flexible job-shop scheduling problem | OPSEARCH | 56 | - | M. Zandieh, R. Tavakkoli-Moghaddam |
34
| مدل سازي مساله مکان يابي و تخصيص در شرايط بحران زلزله و حل آن به وسيله الگوريتم هاي فراابتکاري | مديريت بحران | 15 | - | طيبي، ليونا |
35
| توسعه محصول جديد با ارزيابي و رتبه بندي الزامات فني مهندسي براساس رويکردي ترکيبي از روشهاي ANP-DEMATEL-QFD فازي و DEA | چشم انداز مديريت صنعتي | 34 | - | حسين حسين پور |
36
| حل مسئله زمان بندي چندهدفه ي فرود هواپيما در حالت چندباند | نشريه علمي پژوهشي مهندسي هوانوردي | 21 | - | زهرا فرجي مقدم، زهرا مقدم زرندي |